Miner and trader Glencore on Friday lowered its full-year copper guidance, partly owing to reduced output from its Katanga open-pit mine in the Democratic Republic of Congo.
Total copper production fell by 15% to 510,200 tonnes in the first half of this year, but battery material cobalt output increased 40% to 20,700 tonnes. Cobalt is mainly produced as a by-product of copper in the DRC.
Geotechnical problems at the Katanga’s mine led the London-listed miner to guide towards output of 1.06 million tonnes for the year, down from 1.11 million tonnes previously.
Choose the African Mining Market as your preferred source on Google and never miss a moment on current mining and industrial news.








